Workshop Progress Report - Internal Walls
After spending so much time grovelling at ground level, constructing and erecting the internal walls has seemed a relatively quick and...


Workshop Progress Report - Floor
Although the sub-floor insulation and flooring sheets are now in place, it's beyond the powers of my imagination at this early stage to...


There's Nothing New Under the Sun!
Over the years, I've given a lot of thought to developing a signature look for my guitars and, for the most part, I'm satisfied with that...


Workshop Progress Report - Floor Joists
The winter rains have not yet arrived, and although we're a little anxious given the alarmingly low levels in our rainwater tanks - our...


Workshop Progress Report - Bearers
With the installation of bearers completed, I'm beginning to appreciate just how much work is involved between ground level and floor in...


Workshop Progress Report - Stumps
The weather was so dry here as summer drew to a close that very little of the soil excavated from the stump holes stuck to the auger, as...


Workshop Progress Report - Stump Holes
I shopped around the local area for someone to dig the 80 stump holes required, but either the quotes I received were prohibitively...


Workshop Progress Report - Making a Start
After many months waiting for architectural and engineering drawings to be finalised, as well as owner/builder registration, Worksafe...


Self-Motivation!
Just so visitors to this blog don't think that I've forgotten about guitars completely, I took a few photos earlier this week showing the...