top of page

Workshop Progress Report - Doors and Windows

I had a long wait for doors and windows to be fabricated and delivered, but I'm pleased to report that they're now in place.

I've more or less completed the balustrade that runs along the edge of the deck on the northern side of the workshop, and the decking planks have been secured, except for a gap along the base of the straw bale wall sufficient to allow render to be applied to the wall below deck level.

The rendering contractor indicated he'd spray the first coat of render next week, but with rain forecast I'm prepared to be disappointed. Nevertheless, I can console myself with the idea that it's bound to happen fairly soon.

I've allowed myself time this week to enjoy the view out of the corner window, and the experience is everything I'd hoped it would be. It's wonderful to be surrounded by deciduous trees, particularly as the autumn colours appear, and when the leaves fall and more distant views materialise, I know they'll be a constant, pleasant distraction.

On a glorious autumn day like today it would be easy to doubt that the world has been turned upside down. Please heed the advice of the experts, and stay well!

Cheers

Pete

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page